[Date Prev][Date Next] [Chronological] [Thread] [Top]

(erielack) Re: EL Mail List Digest V3 #2492



When the flour mill was constructed, the DL merely upgraded the four auto 
ramp stub tracks, and added two longer tracks, one for unloading and another 
for loading. Also we upgraded the ramp lead with heavier rail and pandral 
clips, and upgraded the run around siding along the main. So in essance all 
of the Chrysler Auto Ramp track is still there, including the adjustabale 
Buck Loader used to drive the cars off of the auto racks.

David J. Monte Verde 



	The Erie Lackawanna Mailing List
	Sponsored by the ELH&TS
	http://www.elhts.org
	To Unsubscribe: http://lists.elhts.org/erielackunsub.html

------------------------------