[Date Prev][Date Next]
[Chronological]
[Thread]
[Top]
RE: (erielack) NJ/PA - Environmental Assessment for Lacka
- Subject: RE: (erielack) NJ/PA - Environmental Assessment for Lacka
- From: ERIE LACKAWANNA <erie_lackawanna_@_yahoo.com>
- Date: Sat, 20 Jun 2009 08:56:14 -0700 (PDT)
But they were placed in commuter service on EL, NYC, PRR, PC and more after their long distance trains ended
Besides E9's were not a true 2,250 HP engine with two separate SW1200's 1200 HP 557's. So that did not help their acceleration and speed. ALCO PA's had a single 2000 and 2250 HP single engine block. A difference.
Jerome
- --- On Sat, 6/20/09, doubletrack_@_netzero.net <doubletrack@netzero.net> wrote:
From: doubletrack_@_netzero.net <doubletrack@netzero.net>
Subject: RE: (erielack) NJ/PA - Environmental Assessment for Lacka
To: erielack_@_lists.railfan.net
Date: Saturday, June 20, 2009, 11:45 AM
E8s were Never Intendid for Commuter Runs they wer built for Intercity limited stop trains evn Alco PAs accelerated faster than E units today a PL42 or the upcoming ALDP 45s (not sure what the real model name for the dual power units will be) and whatever type cars ar built at that time would be the consists.
This Message Sent by Donald Kern
The Erie Lackawanna Mailing List
http://EL-List.railfan.net/
To Unsubscribe: http://Lists.Railfan.net/erielackunsub.html
The Erie Lackawanna Mailing List
http://EL-List.railfan.net/
To Unsubscribe: http://Lists.Railfan.net/erielackunsub.html
------------------------------